Please be advised that a portion of Main Street South (Highway 7) will be closed for road repair and watermain replace.
Starting August 3, 2021 and for approximately 5 weeks, the portion of Main Street South in Rockwood at Frederick Street to Harris Street (Wellington Road 50) will be closed with absolutely no through traffic onto Main Street South from Carrol Street.
During this closure, only local traffic will be permitted with all other traffic to be detoured from Highway 7 to the Eramosa/Milton Townline to Wellington Road 44.
The Township has coordinated with GO Transit and for the duration of the closure, the stop south of Harris Street will not be serviced. Patrons must utilize the stops at Harris Street and Main Street South (Highway 7). GO Transit will install temporary stops on Harris St., east of Main Street South. Go Transit will post notices at the four out-of-service stops, directing passengers to Harris St. The sidewalk on one side of the closed road will be maintained open for pesdestian access along Main Street South. For more information, please contact GO Transit. Residents whose garbage will be affected by this closure will receive a letter from the Township with further instruction.
The Township of Guelph/Eramosa apologizes for any inconvenience this may cause. Questions or concerns should be directed to:
Alisha Dennis
Public Works Assistant
Ph: 519-856-9596 ext. 121
E: adennis@get.on.ca
Back to News